The second phase of an onshore oil development: 38 new wells, a second processing train and a produced-water reinjection scheme that lifts the field from 26,000 to 45,000 barrels a day.
At a glance
Al Nakhil was discovered in 2009 and brought on stream in 2014 with a single 26,000 barrel-a-day train. Ten years of production history sharpened the reservoir model considerably: the original development left the northern flank under-drained, and pressure support across the main compartment turned out to be weaker than the appraisal wells had suggested.
Phase II answers both problems at once. Twenty-four infill producers target the northern flank and the attic oil left above the original well spacing, while fourteen injectors restore reservoir pressure with treated produced water — which also solves the disposal problem the field would otherwise face as the water cut climbs past 60%.
Associated gas that Phase I flared is now compressed and sent 41 km to the Rish Dune plant, where it is treated and sold. That single change removes roughly 90% of the field's routine flaring and pays for the compression within four years at long-run gas prices.