Karat Deep Gas Appraisal

Appraisal of a deep, high-pressure sour gas structure — three wells below 5,200 metres, extended well testing and a development concept study for a resource that may exceed 4 trillion cubic feet.

In development
AppraisalSour gasHPHTCaspian

At a glance

Status
In development
Location
Karat structure, North Caspian basin, Kazakhstan
Period
2025 — 2029
Our role
Operator, 40% working interest
Target depth
5,200 — 5,900 m
Appraisal wells
3, first spudded March 2026
Reservoir pressure
1,020 bar
H2S content
6 — 9% (from discovery well)
Resource estimate
2.8 — 4.4 Tcf (unrisked)
Concept select
2029

About the asset

The Karat structure was drilled once, in 1991, and the well was abandoned at 5,050 metres after a gas kick that the rig of the day was not equipped to control. The log suite it left behind is thin, but it shows gas in a carbonate reservoir at pressures that put the structure among the more demanding in the basin.

Falaj took operatorship of the appraisal in 2025 with a 40% working interest. The first well spudded in March 2026 using managed-pressure drilling and a full sour-service casing programme; two more follow through 2027 and 2028.

Nothing about this project is decided. Appraisal exists to answer whether the resource is real, whether the sulphur can be handled at scale, and whether a development is worth sanctioning at all. Concept selection is scheduled for 2029, and abandoning the structure remains one of the outcomes on the table.

Scope of work

  • Reprocessing of 1,900 km2 of 3D seismic with full-waveform inversion
  • Three appraisal wells with managed-pressure drilling
  • Extended well testing and downhole fluid sampling
  • Sour-service metallurgy and materials selection study
  • Development concept screening, including sulphur logistics
  • Baseline environmental survey across the licence area

Upstream

Related assets

All assets

Al Nakhil field, Rub' al Khali margin2023 — 2027

Al Nakhil Field Development, Phase II

The second phase of an onshore oil development: 38 new wells, a second processing train and a produced-water reinjection scheme that lifts the field from 26,000 to 45,000 barrels a day.

Under constructionDetail