Midstream

Ras Sahil Terminal Expansion

Two additional 780,000-barrel crude tanks, a second loading berth and a vapour recovery unit, doubling the terminal's throughput and cutting loading emissions by 96%.

Under construction
TerminalStorageMarineVapour recovery

At a glance

Status
Under construction
Location
Ras Sahil, coastal terminal, Oman
Period
2024 — 2027
Our role
Operator and project delivery
New storage
2 tanks, 780,000 bbl each
Total capacity after
4.1 million barrels
Berths
2, up to Suezmax
Loading rate
8,000 m3/h per berth
Vapour recovery
96% of loading emissions
Commissioning
Q4 2027 (forecast)

About the asset

The terminal was built for one berth and 2.5 million barrels of storage, and it has run at the limit of both since 2022 — tankers waited, and inland production was occasionally choked back to match the loading window rather than the other way round.

The expansion adds two 780,000-barrel floating-roof tanks and a second berth capable of taking Suezmax vessels at 8,000 cubic metres an hour. A vapour recovery unit serving both berths and the tank farm captures 96% of the hydrocarbon vapour displaced during loading, which was the terminal's single largest emissions source.

Marine work is sequenced around the summer swell season and the turtle nesting window on the adjacent beach, both of which were fixed constraints in the schedule from the first day of planning rather than accommodations made later.

Scope of work

  • Two floating-roof tanks with full secondary containment
  • Second loading berth, trestle and marine loading arms
  • Vapour recovery unit serving both berths and the tank farm
  • Firewater upgrade, foam system and revised emergency response
  • Custody metering, blending and tank gauging replacement
  • Dredging and navigation study for the approach channel

Midstream

Related assets

All assets

Rish Dune, Al Wusta2016 — present

Rish Dune Gas Processing Plant

A 320 MMSCFD sour gas processing and treatment plant taking associated and non-associated gas from four surrounding fields and delivering sales-quality gas into the national transmission grid.

OperatingDetail

Al Nakhil to Ras Sahil terminal2018 — 2021

Coastal Export Pipeline

A 420 km, 32-inch buried crude export line linking inland production to the coastal terminal, with three pump stations and a full leak detection and integrity system.

CompletedDetail